@thesis{thesis, author={Ajie Ilham Galih and Pramono Tri Joko}, title ={Evaluasi Pemerataan Beban Dengan Metode Pemasangan Transformator Sisip di Gardu Distribusi Ciledug}, year={2019}, url={http://156.67.221.169/1576/}, abstract={Loading the distribution transformer that has exceeded its capacity or it can be said that the transformer has overloaded, the transformer will be flowed with a current greater than the nominal current. To overcome the overload problem, the action that can be taken is to reduce the distance between the load and the distribution transformer through reconfiguration or load transfer or by inserting the transformer insertion, uprating the distribution transformer to meet the overload load balancing on the GDN transformer at the Ciledug Distribution Station in the Tangerang Lama area where counted on one of the phases, 103.87% and the loading capacity which has reached 78.76% almost reached the maximum standard. So after carrying out the transfer of load by installing the transformer insert capacity loading to 47.8% which means much better. As a result of the load imbalance, it causes a current in the neutral conductor transformer which causes losses, after analyzing losses due to load imbalance before equalization of the load is 11.13 kW with a percentage of 3.27% and after equalization the load is obtained 13.70 kW with percentage of 4.03%.} }