@thesis{thesis, author={Hadinoto Benjamin and Samsurizal Samsurizal}, title ={Penyelesaian Transformator Yang Overload Terhadap Kualitas Daya di PT PLN (Persero) UP3 Pondok Gede}, year={2019}, url={http://156.67.221.169/1856/}, abstract={With over population growth rate annually growing by leaps and bounds can be seen from the data on population, recorded in 2015, the number of residents in the region amounted to 2.733.240 soul and the big lodge in 2019 reached the figure of 3.013.851 people, according to agency statistics center. And this affects the demand for electricity is also increasing every year recorded in 2015 324.175 and in 2019 the demand for electricity has reached 359.098. At the distribution substations with JS number 190, known to an increase in load on the transformer is by presentation of 95.75% loading of transformer capacity of 200 kVA. In order to improve these conditions, PT PLN (Persero) has sought to add power uprating transformer or transformers with a capacity greater than 200 kVA to 400kVA. Having obtained a large transformer load uprating 52.75%. From these results, uprating transformer is one method that can be used to cope overload on the transformer.} }