@thesis{thesis, author={Rusjdi Halim and TRIAYUNI SOLEKHA H}, title ={PENGAPLIKASIAN MANAGEMENT OUTAGE PADA PENGUKURAN CLEARANCE TURBIN DI PLTU UNIT 3 PT PJB UP GRESIK}, year={2019}, url={http://156.67.221.169/2046/}, abstract={The Gresik Steam Power Plant has an overall power capacity of 600 MW. Especially in the Unit 3 PLTU PT PJB UP Gresik with a capacity of 200 MW. Every machine tool in the plant will experience a decrease in quality both in terms of physical and performance, so there needs to be an overhaul. PT PJB created a management to manage all overhaul activities, namely Management Outage. In this study, the author explains how the application of Management Outage during overhaul by going through turbine clearance measurements. This overhaul is a routine maintenance activity that is carried out every 16,000 hours (Medium Inspection). With the Management Outage, routine maintenance activities (overhauls) planned and prepared perfectly must be done because it is in accordance with the design of the manufacturer to maintain the condition of the turbine remains good. From the data, there can be several measurements that are over clearance, namely the radial spill strip, the labyrinth gland and the diapragm nozzle. So it needs to be repaired / replaced.} }