@thesis{thesis, author={Hariyati Rinna and Siahaan Aldo Mashar}, title ={Upaya Penekanan Susut Teknis Akibat Ketidakseimbangan Beban Pada Gardu Distribusi PJI 11 Di Wilayah Area Depok, Jawa Barat, Rayon Depok Kota}, year={2017}, url={http://156.67.221.169/2146/}, abstract={ABSTRACT Loss (loss) is divided into two factors, namely due to technical factors derived from equipment or electrical components installed. From overloaded transformers, uneven JTM and JTR Transformers, JTM and JTR are too long and the pull of House Connection exceeds the standard, while non-technical shrinkage comes from the APP (Measurement Measurement Tool) blurred so that the meter defect has problems, the public street lighting Illegal also the use of Illegal electricity such as. MCB and Direct Dial. Imbalance in a system. That accumulates. Land loss. In the results found on the distribution substation PJI 11 with 200kVA capacities, can not be evenly and above is large enough, therefore the project needed to balance the phase on the minimize loss relay.} }