A PHP Error was encountered
Severity: Warning
Message: fopen(/home/rama/public_html/application/cache/sessions/rama_session9q7nprm72nr18p1bke91pjh3oahdf187): failed to open stream: No space left on device
Filename: drivers/Session_files_driver.php
Line Number: 174
Backtrace:
File: /home/rama/public_html/application/core/MY_Controller.php
Line: 8
Function: __construct
File: /home/rama/public_html/application/controllers/Document.php
Line: 6
Function: __construct
File: /home/rama/public_html/index.php
Line: 296
Function: require_once
@thesis{thesis,
author={Indani Prinanda and Pantouw John Paulus},
title ={Tinjauan Aspek Hidrologi Untuk Desain Pengalihan Sungai Pada Bendungan Lau Simeme Kabupaten Deli Serdang
Sumatera Utara},
year={2019},
url={http://156.67.221.169/2246/},
abstract={All living things in the world definitely need water to live both animals, plants and humans, it can be imagined that if we lived without water, we can be sure that it would be difficult to survive, so it can be said that water is one source of life. One of the multi-functional water structures is the Dam. Lau Simeme Dam has many functions, namely providing raw water of 3000 liters / second, as a hydropower plant that produces 2.8 MW, aquaculture where its main function is as flood control of Medan City. To begin the construction to build the dam is preparation work that must be done and build diversion tunnel first. Diversion tunnel functions to divert, accommodate the flow, the river so that in the downstream of the dam functions as tourism, in this thesis discussed about the analysis of the failure of the work of the diversion tunnel with 2, 3, and 4 years with a probability of 10%, 15% and 20%. With the results of the analysis, it is necessary to raise the cofferdam from planning with an elevation of +203 m elevated to an elevation of +212,35 m.}
}