@thesis{thesis, author={PUTRA AHMAD WARITSI HERLA and SEPRIYANNA IRMA}, title ={ANALISIS PERHITUNGAN SECANT PILE PADA PROYEK FAMILY ENTERTAINMENT CENTER KOMPLEK TAMAN RIA JAKARTA PUSAT}, year={2018}, url={http://156.67.221.169/234/}, abstract={Basement is one solution for limited land, especially in Jakarta. In the implementation of the basement work there are several obstacles that often occur such as rising ground water levels and landslides around the excavation. To overcome this problem, it is necessary to have a retaining wall, one of which is using pile secant. Pile Secant are designed to have optimum stability and strength that can withstand lateral forces from the ground. In pile secant planning, it is necessary to calculate the amount of lateral pressure and the depth of penetration and calculate the magnitude of the moment and shear forces that occur. The purpose of this thesis is to calculate the magnitude of lateral pressure and penetration depth of pile secant without anchor and by using anchor and calculating the value of SF, shear force and moment style by using a plaque program. The method used in calculating the depth of penetration is the method of calculating cantilever plaster and sheeting, and the element method in the plaque program. The results obtained from the lateral force calculation are 356,92 kN/m and the calculation of penetration depth is 5,72 m for pile secant without using anchor and 1,84 m for pile secant using anchor. Whereas for the results of the plaxis program calculation that is for pile secant without using anchor obtained SF is 4,97, the shear force is 351,08 kN/m and the moment force is 605,20 kN/m. for pile secant using angkur obtained SF of 10,26, shear force of 159,67 kN/m and momentary force of 157,59 kN/m.} }