A PHP Error was encountered

Severity: Warning

Message: fopen(/home/rama/public_html/application/cache/sessions/rama_sessionovfd6c0bm11oij4t2m6po1lt725se1rl): failed to open stream: No space left on device

Filename: drivers/Session_files_driver.php

Line Number: 174

Backtrace:

File: /home/rama/public_html/application/core/MY_Controller.php
Line: 8
Function: __construct

File: /home/rama/public_html/application/controllers/Document.php
Line: 6
Function: __construct

File: /home/rama/public_html/index.php
Line: 296
Function: require_once

@thesis{thesis, author={Sanella Asyam Viera and Santoso Januwarsono and Simamora Yoakim}, title ={KAJIAN KELAYAKAN ENERGY STORAGE SYSTEM (ESS) KAPASITAS 30 MW SEBAGAI IMPLEMENTASI PROGRAM DEMAND SIDE MANAGEMENT (DSM) PADA SISTEM SULAWESI UTARA - GORONTALO}, year={2020}, url={http://156.67.221.169/2825/}, abstract={Energy storage media are needed along with the development of the age in which technology and electricity sales business is growing. There are a variety of electrical energy storage, one of which is a battery. The battery has the main function as a storage of electrical energy. This storage method can be utilized, one of which is the first when a normal load of electrical energy will be stored in batteries and stored energy is used for supply during peak load. the second with the use of Demand Side Management (DSM) in the Energy Storage System (ESS) as an optimization of the Cost of Electricity Production (BPP), which initially in the NORTH-GORONTALO SULAWESI System uses the Leasing Marine Vessel Power Plan (LMVPP) Karadeniz. In this study the Energy Storage System (ESS) power used was 30 MW with a long usage time during Peak Load Time (WBP) for 5 hours. And charging with a power of 15,000 kW for 10 hours. The results of this study have the potential to save when using the Demand Side Management (DSM) method in the Energy Storage System (ESS) as a substitute for the use of Karadeniz Leasing Marine Vessel Power Plan (LMVPP). in the SULAWESI - GORONTALO system is Rp. 20,883,199,187.14 per year and can streamline the cost of electricity production (BBP) of Rp. 483.41 / kWh.} }

A PHP Error was encountered

Severity: Warning

Message: Unknown: Failed to write session data (user). Please verify that the current setting of session.save_path is correct (/home/rama/public_html/application/cache/sessions)

Filename: Unknown

Line Number: 0

Backtrace: