@thesis{thesis, author={EKA PUTRA NUYEVALDO and Makkulau Andi and Yogianto Aloysius Agus}, title ={ANALISIS SKEMA PELEPASAN BEBAN LEBIH PADA INTERBUS TRANSFORMER (IBT) PADA SUBSISTEM MUARA KARANG – GANDUL 1,3 – DURI KOSAMBI 2}, year={2020}, url={http://156.67.221.169/2886/}, abstract={The development of new infrastructure such as power plants, substations and transmission lines to meet load needs is a challenge that is always faced by utility power systems, including the Java-Bali system. High load growth that is not balanced with the growth of installation causes the loading of installation is increasing, even can cause more loading (overload). One of the schemes applied by PT. PLN (Persero) is the excess overload defence scheme. At Research It examines The defense scheme applied is the scheme Of Overload shedding (OLS) IBT 500/150 KV subsystem Muara Karang ? Gandul 1.3 ? Duri Kosambi 2. The OLS IBT 500/150 kV scheme should be well-balanced to prevent more load on IBT. IBT's 2 Duri Kosambi includes the latest IBT on the Java-Bali operating system and enters the Muara Karang subsystem ? Gandul 1.3 ? Duri Kosambi 2. IBT 2 Duri Kosambi in conjunction as a follow-up to overcome the blackout system of Java ? Bali on 04 August 2019, with Contingency (N-1) and (N-2). The qualitative method of analysis is to analyze the possibility of the overload of IBT. Hacyl This Research can be analyzed when IBT contingency (N-1) OLS scheme does not need to BE done, when (N-2) The OLS Scheme starts to work to carry out The load release.} }