@thesis{thesis, author={Azani Syintia and Azzahra Septianissa and Purwanto Sugeng}, title ={Perbaikan Jatuh Tegangan pada Saluran I Trafo 1 Gardu Distribusi KB 287 dengan Metode Pecah Beban di PT.PLN (Persero) Area Menteng, Gambir}, year={2020}, url={http://156.67.221.169/3019/}, abstract={The good power system does not exceed the tolerance limit of the specified voltage value of the state electricity company, where the voltage tolerance limit is + 5% and-10% of the nominal value (SPLN 1:1995). The distance between the load position with the distribution center is far enough that it can result in its problems in the transmission of electrical power even the condition and demand large loads are unstable though, leading to mainly falling its voltage. In order to reduce the subject of falling voltage, it repairs the tension by leveling the load using the load break method. In this thesis discusses voltage fall on the channel I transformer 1 Gardu distribution 287 with a percentage calculation exceeding than 10% tolerance voltage i.e. phase R 13.63%, phase S 13.13%, and phase T 8.07%. Then in the repair by the method of load rupture moved as many as 4 poles I to the channel D Trafo 2. With the result percentage voltage at phase R 4.59%, phase S 4.97%, and phase T 6.3%. The value means that it is in accordance with the tolerance limit (SPLN 1:1995) which is + 5% and-10%.} }