@thesis{thesis, author={Hunzu Sitio Charis David and Pratama Putra and Samsurizal Samsurizal}, title ={PERBAIKAN JATUH TEGANGAN TR PADA RUMAH PELANGGAN YANG DI SUPLAI GARDU GD108 DENGAN MENGGUNAKAN METODE PECAH BEBAN DI PT PLN (PERSERO) UP3 CIRACAS}, year={2020}, url={http://156.67.221.169/3026/}, abstract={In the operation of the electric power system, good quality service is needed. One of them is the voltage value received by the customer does not get a voltage drop. Based on SPLN No.1: 1978, the service voltage is a maximum of 5% and a minimum of 10% of the nominal voltage of the Low Voltage Network that is 220 V. One of the locations experiencing voltage drop problems is on the Sawit Street Komplek Hankam, Cimanggis. Based on an analysis do by the PT PLN UP3 Ciracas Network division, it turns out that the voltage drop that occurred on Sawit Street Komplek Hankam, Cimanggis caused by the location of the location is far from the GD 108 distribution substation, which is 418 meters. That certainly has passed the ideal limit set by PT PLN. According to SPLN 1: 1978, the ideal distance of service set by PT PLN is 305 meters. Then, the area around the location also has a high burden due to the many standing residential settlements and shops. Therefore, it is necessary to break the load on the network. This method is done by moving or transferring part of the load from the old network to the new network. This is done because the greater the current flowing in a conductor, the greater the voltage drop that occurs in the conductor. Therefore, load relocation needs to be done so that the load on a network becomes lighter and voltage values are obtained in accordance with the standards set by PT PLN.} }