@thesis{thesis, author={Husada Hendriyanto and Musfita Gita Ayu and Suyanto Heri}, title ={ANALISA PEMBANGKIT LISTRIK TENAGA SURYA (PLTS) ROOFTOP ON GRID 4,2 KWP DI BANJAR WIJAYA CLUSTER PINEWOOD}, year={2020}, url={http://156.67.221.169/3075/}, abstract={Filling the electrical energy necessity which is needed by Indonesia society one of the is by urilizing the renewable energy like solar cell power plant (PLTS). PLTS utilizes the sun intensity to get electrical energy by using photovoltaic technology. Nowday using the on-grid PLTS has been applied widely in Indonesia, one of them is using on-grid rofftop PLTS at a house in Cluster Pinewood BanjarWijaya, Cipondoh, Tangerang. So in this research analyzed the PLTS in accumulation of output energy result then compare the helioscope energy output result, or saving calculation in economic aspect. From That PLTS analysis gets energy output result in April 2020 that is 412,3 kwh. The calculation of house?s electricity bill cost before the PLTS installed with 1150,58 kWh is Rp. 1.958.310,17, while the electricity bill cost after PLTS is installedwith 748,72 kWh is Rp. 1.274.336,41. So it gets Rp. 683.973,76 money saving in a month in April 2020. Based on planning calculation energy output by using the helioscope is 472.25 kWh, while from the energy output of direct measurement is 398,05 kWh the it gets output energy ratio of 84%. That value obtained because light intensity, temperature, and module cleanliness.} }