A PHP Error was encountered
Severity: Warning
Message: fopen(/home/rama/public_html/application/cache/sessions/rama_sessionl37kof6uqeg2u4adhfgt9s81pnr138b2): failed to open stream: No space left on device
Filename: drivers/Session_files_driver.php
Line Number: 174
Backtrace:
File: /home/rama/public_html/application/core/MY_Controller.php
Line: 8
Function: __construct
File: /home/rama/public_html/application/controllers/Document.php
Line: 6
Function: __construct
File: /home/rama/public_html/index.php
Line: 296
Function: require_once
@thesis{thesis,
author={Senen Adri and Sianipar Veron Gokhlas and Widaystuti Christine},
title ={PERENCANAAN PEMERATAAN BEBAN PADA GARDU AB 212 PENYULANG MOTEL DI PT.PLN (PERSERO) UP3 BANDENGAN},
year={2020},
url={http://156.67.221.169/3105/},
abstract={In the 3 phase system, very often the occurrence of load imbalance of the most specialized transformer on the low voltage distribution system. This is because of the many additions to the electrical loads that do not pay attention to the system imbalance. Basically the load sharing on the R, S, T side should be designed to be balanced but in reality it is not balanced, the cause is the presence of customers who want to add weight. The load imbalance in the transformer phase results in the loss of the transformer as well as in the electric power system. If this is allowed then it causes damage to the transformer. Load imbalance problems should be minimized to achieve optimum level of performance of the transformer. From the measurement of load on the distribution station AB 212 conducted on May 27, 2020 at 18.15, the percentage calculation of load imbalance and the percentage of transformer loading and obtained percentage 36.51% after the load distribution, the percentage of the load was 36.18%. To indemnification loss before the equalization of the load is 16,7 KW after distribution of the load is obtained loss of the sender to 4,1 KW.}
}