@thesis{thesis, author={Husada Hendrianto and Prasetyo Ahmad Rifqi and Suyanto Heri}, title ={Studi Kelayakan Proyek Pemasangan Pembangkit Listrik Tenaga Surya 400 kWp Terpusat di Pulau Sebira}, year={2020}, url={http://156.67.221.169/3127/}, abstract={Sebira Island is one of the island that is located in the Thousand Islands of DKI Jakarta with a remote land distance of 119 KM makes this island has not obtained electricity network PLN. Has an area of 8.82 Ha with a population reaching 662 people to electricity in Sebira Island still using genset for daily needs. Sebira Island requires 1240.32 kWh per day. With the potential of good solar energy is that with an average radiation of 5.45 kWh/m² can be utilized by the existence of solar power plants for the electricity of Sebira Island. In the solar power Plant development project, Sebira Island uses an Off-Grid AC Coupling system, with the aim of powering 24 hours of electricity by preserving battery life efficiency in order to maintain a reliable and sustainable system. The capacity installed on the Serbira Island solar power plant of 400 kWp can generate energy 676345 kWh for a year. Financial feasibility in the project obtained a perkWh price of Rp. 5,046 with a return of capital for 4 years.} }