@thesis{thesis, author={Nur Qosim Muchammad and Pratama Putra Rizki and Tutthayyibah Umniya}, title ={Perencanaan Pembangkit Listrik Tenaga Surya Off Grid di Dusun Bunklotok Desa Batujai Lombok Tengah}, year={2021}, url={http://156.67.221.169/3138/}, abstract={In Outlook energy book which is published in 2019, till 2018 Indonesia consums 115 tons coal, so the prediction of coal available until 2074. The government is doing the expansion effort in using the renewable energy to make sure the fosil energy wich is planned the using of renewable energy up to 23% until 2025, but until 2019 the renewable energy used just up to 9,15%. Lombok island is the island which is installed 7 PLTS powerplants which supply up to 8,5% energy of 233 MW consumtion. In this research will analyze the PLTS planning to realize the government planning in using renewable energy by using PVSyst software simulation method at dusun Bunklotok, Batujai Central Lombok. The load planning in this PLTS is 254,784 Wh / day, and 7643.5 Kwh/ month, so it needs 250 solar panel modules which can generate 116,9 MWh / year, and energy used by consuments is 91.677 KWh / year. The value of NVP of this planning is Rp 3.247.050.166 and PI (Probability Index ) is 2.299, so this PLTS planning worth to be done} }