@thesis{thesis, author={Hajar Ibnu and Pasra Nurmiati and Rusmansyah Denny}, title ={ANALISIS VOLTAGE DROP PADA JARINGAN TEGANGAN RENDAH DENGAN METODE PECAH BEBAN PADA GARDU KH 007 DI PT PLN(Persero) UP3 PAMEKASAN}, year={2020}, url={http://156.67.221.169/3159/}, abstract={In the operation of the electric power system, good quality service is needed. One of them is the voltage value received by the customer does not get a voltage drop. Based on SPLN No.1: 1978, the service voltage is a maximum of 5% and a minimum of 10% of the nominal voltage of the Low Voltage Network that is 220 Volt. One of the locations experiencing voltage drop problems is on the Central Pakandangan Village, Sumenep. Based on an analysis do by the PT PLN UP3 Pamekasan Network division, it turns out that the voltage drop that occurred on Central Pakandangan Village caused by the location. The location is to far from the KH 007 distribution substation, which is 643 meters. Then, the area around the location also has a high burden due to the many standing residential settlements. Therefore, it is necessary to break the load on the network. This method is done by moving or transferring part of the load from the old network to the new network. Which is the last 5 poles in this line. so the load supported by one line does not have voltage drop. The result obtained after performing the load break is that the voltage on the receiving side rises to phase R 200 Volt, phase S 212 Volt, and phase T 202 Volt. Where previously the value of the voltage on the receiving side is phase R 189 Volt, phase S 206 Volt, and phase T 194 Volt.} }