@thesis{thesis, author={D Siswoyo Sriyono and Febrianto Gyo Dwi}, title ={Analisis Produktivitas Dan Biaya Pekerjaan Pengecoran Corewall Menggunakan Automatic Climbing System (ACS) Dan Konvensional Pada Proyek Pembangunan Gedung Indonesia 1}, year={2020}, url={http://156.67.221.169/3333/}, abstract={Technology in the construction world is growing rapidly, which is characterized with the emergence of various new innovations, both in terms of equipment, materials, and methods of implementation. One of the construction work that has a new innovation is the work of the formwork. On Indonesia One Project used two methods implementation for casting corewall that is automatic climbing system and conventional. It is necessary for an analysis of the type methods will be used. Analysis calculation of the cost and productivity on Indonesia one project, have a results of Automatic Climbing System in the productivity is 15,2 m3/hour, and for conventional is 7,44 m3/hour. Meanwhile for cost on m3 have a results of conventional is Rp. 2.091.518,791 and for automatic climbing system is Rp. 2.150.861,049} }