@thesis{thesis, author={Handayani Oktaria and Ikhtiyar Yusuf}, title ={Analisis Kesalahan Pengukuran Energi Listrik Pada Pelanggan Dengan Daya 105 KVA Di PT. PLN (Persero) Up3 Semarang}, year={2020}, url={http://156.67.221.169/3536/}, abstract={The Automatic Meter Reading (AMR) system is a remote monitoring communication system utilizing a telecommunications network to increase the accuracy of measuring kWh meters and other disturbances such as unmeasured electrical energy. kWh meter installed to the Customer using an indirect measurement system. In this final project, a research was conducted on the analysis of electrical energy measurement errors for customers with 105 kVA power at PT. PLN (Persero) UP3 Semarang. This research was conducted at PT. PLN (Persero) UP3 Semarang to JK customers. Transport. Which in Phase R is not measured because the Current Transformer (CT) is burning, due to the use of an excess load of electrical energy on JK customers. Transport. After checking, validating measurements, and withdrawing the load profile data for Automatic Meter Reading (AMR), it is indicated that the electrical energy that is not reduced in Phase R has been occurring for nine months. Namely from October 2019 - June 2020. From the results of the calculation of the less billable energy that has not been measured for nine months, namely from October 2019 - June 2020 at PT. JK. Transport with data calculated at 2401,85 kWh and accounts for less receivables of. Meanwhile, in the calculation with measured data, PT Jk Transport has to pay for less energy bills of 22.829 kWh and under-collection bills to PT. PLN (Persero) amounting to IDR 23.281.474.} }