@thesis{thesis, author={Irfansyah Rakhmadi and SUHANDI RIZKY}, title ={PERANCANGAN APLIKASI SISTEM MANAJEMEN PROYEK UNTUK MENENTUKAN TITIK KRITIS MENGGUNAKAN CRITICAL PATH METHOD}, year={2014}, url={http://156.67.221.169/369/}, abstract={In every part of the project, there is certainly a risk that if it would be a threat. the user is still much to predict the risk based on experiences and manually calculate Waterfall is a software development methodology that is proposed approach to the systematic and sequential software which started at the level of progress on the whole system analysis, design, code, test and maintenance. Critical Path Method is a method of planning and controlling projects. CPM can determine the priority of each task of the project This application provides information about the tasks to be prioritized in order to plan the work can be completed on time.} }