@thesis{thesis, author={Husada Hendrianto and Meilasari Windi Tri}, title ={Perencanaan Sistem PLTS Hybrid 5 kWp Di Kantor Desa Grujugan Jawa Tengah}, year={2021}, url={http://156.67.221.169/3819/}, abstract={Electrical energy plays a very important role in supporting human life. Savings on electricity bills can be done by applying a solar power plant to the electrical installation of the office building. This study discusses the planning of a hybrid solar power plant on the roof of the Grujugan Village office building. In this study, we will discuss how to design a hybrid system both technically and economically in accordance with the conditions in the Grujugan village office building. The components in this study consist of: solar panels, batteries, inverters and PVsyst as the simulator. The PLTS system with a capacity of 4336.02 watt peak on the roof of the Grujugan Village office is planned to produce 7219.0 kWh of electrical energy per year with a performance ratio of 0.82 with a return on investment of 19 years and 6 months.} }