@thesis{thesis, author={Hutadjulu Albert Gifson and SHIPA MUHAMMAD QORI}, title ={Studi Perencanaan Rekonfigurasi Jaringan Distribusi Dengan Penarikan Jaringan SUTM feeder 2 Situjuh ke feeder 3 Aur Kuning dalam Mengurangi Susut Daya untuk Meningkatkan Keandalan Jaringan Distribusi Kota Payakumbuh}, year={2021}, url={http://156.67.221.169/3845/}, abstract={Network reconfiguration in the form of network withdrawal from feeder 2 Situjuah to feeder 3 Aur Kuning was carried out to reduce power losses and to create new channels for the maneuvering process to keep the Batang Agam hydropower plant connected to the 150 kV substation for the interconnection system. The importance of network reconfiguration is also based on SPLN 59-3-4:1985 regarding electricity growth rate and service quality. In this study, an analysis of network configuration data was carried out so that it could prove that the SUTM network withdrawal from feeder 2 Situjuah to feeder 3 Aur Kuning was the right location. The towing of the SUTM network will be simulated using the electrical transient analyzer program (ETAP) software version 12.6 to observe the maneuvering process and observe a decrease in the value of power losses. The results of the research will be described in the form of schemes so that the problems that occur can be more easily understood, then the results of network reconfiguration will be simulated to obtain power loss data which will then be compared to the distribution network power loss value before and after reconfiguration as a benchmark for changes in system reliability. The value of power loss before network reconfiguration is 0.499 MW. After reconfiguring the network the value of power loss decreases, using a 240 mm2 conductor the smallest power loss value is obtained at 0.319 MW. Then with a 150 mm2 conductor, the power loss value is 0.324 MW. And with a 70 mm2 conductor, the power loss value is 0.340 MW} }