@thesis{thesis, author={Haningsih Debi and Kurniasih Novi and Rusli Muhammad}, title ={Analisis Koordinasi Proteksi Over Current Relay dan Ground Fault Relay Penyulang 20 kV pada Gardu Induk Aur Duri Jambi}, year={2021}, url={http://156.67.221.169/3973/}, abstract={Based on fault data for a period of one year (January 2020-December 2020) it was found that there was a coordination error in the protection system in one of the feeders supplied by a 60 MVA power transformer number 3. The Ketapang 20 kV feeder which caused the recloser to fail to work so that the trip went through to the outgoing GFR at the Aur Duri Jambi Substation. In order to assist the process of analyzing the coordination of this protection relay, using DIgSILENT Power Factory 15.1 as supporting software. From the three coordination conditions analyzed, it can be seen that there are Over Current Relay (OCR) and Ground Fault Relay (GFR) settings which have grading times that are not up to standard. This condition can cause coordination errors that allow backup protection to also work (trip) because it does not provide sufficient time for main protection to work to cut off disturbances first. Based on the data from the calculation settings, it can be seen that the value of the grading time between the outgoing trip and the recloser on single phase to ground fault in front of the recloser which was originally with the existing setting was 0.109 s (too narrow) to 0.307 s. This coordination error has an impact on decreasing system reliability and causing losses in the form of energy not served amounting to 82.446 kWh or equal to kWh of 121,772,178 IDR.} }