@thesis{thesis, author={Bawono Mustiko and RAHMAN ARIF}, title ={Kajian Kinerja kehandalan PLTA Saguling Dengan Penerapan Aset Management}, year={2018}, url={http://156.67.221.169/469/}, abstract={PLTA (Hydroelectric Power Plant) is one of the renewable energy which is the supplier of electricity for Indonesia. The main energy source from hydropower is water so that it can produce the electricity needed. Assets used affect the performance generated at the Saguling Hydroelectric Power Plant, the implementation of asset management in the Saguling Hydroelectric Power Plant that is to manage the assets contained in the company, thus maintaining the performance of existing assets and increasing the reliability of the plant. And to find out the performance of UP Saguling PLTA with the implementation of asset management. Analysis is needed on generator performance indicators and 6 pillars of asset management From the results of the analysis obtained in 2016, 2017172018 that the generator performance indicators get the following results, the highest EAF is in 2017 at 96% and the lowest in 2016 at 90% , and the highest EFOR in 2017 is 0.47% and the lowest is in 2018 that is 0. then SDOF is the highest in 2017 at 5, the lowest in 2018 is 0, the last SOF is the highest in 2016 at 9.83%, the lowest in 2017 is 3.71 % and From the results of the 6 pillar analysis of Asset management, Operation Management is the highest in 2017 at 4.36 , the lowest in 2018 is 4.16. the two highest Realibility Management in 2016 amounted to 4.19, the lowest in 2018 was 3.89 . The third highest supply chain management in 2018 is 0, the lowest in 2017 is 0. The fourth work, planning, control management is the highest in 2018 4.30 , the lowest in 2017 is 4.27 . The five highest Outage Management in 2016 and 2017 are 4.25 , the lowest in 2018 is 3.33 . The sixth highest Life Cycle Management in 2016 was 3.11 , the lowest in 2017 was 1.76 .} }