@thesis{thesis, author={Mangatta Guntur Pakendek Donri and Pasra Nurmiati}, title ={ANALISIS SETTING ULANG AUTORECLOSE RELAY PADA JARINGAN TRANSMISI 150KV LINE TELLO-PANAKUKANG}, year={2022}, url={http://156.67.221.169/5039/}, abstract={To reduce the occurrence of disturbances in the distribution of electrical energy, a reliable protection system is needed as a safety. In the case at the Tello-Panakkukang Substation, a protection system failure occurred which resulted in a Trip on the Line. Resetting the autoreclose relay is needed, so that the system returns to normal. It can be seen from the reset that the LLDB is interrupted by a bus of 5 Ampere in the IL1 phase, a disturbance will occur for 1 second and will be normal for 1 second after that. Whereas in DLLB where VL1 is injected with a nominal value of 57.74V for 25 seconds and is given a fault current of 0.5 seconds of 5 Ampere at VL1, VL2 and IL1, IL2 then the system will turn off for 1 second (dead time) and will return normal in the next 1 second, this is a 1 phase to ground fault. In the transmission there are two types of interference, namely temporary and permanent interference. About 100% of what happens is a temporary disorder. There are power losses that can hinder the distribution of electrical energy at the substation, it is known that the Tello-panakukang substation is not in interconnection, the duration of the temporary disturbance without autoreclose is 1 hour for the temporary disturbance of autoreclose for 5 seconds based on the longest time setting and in the calculation, the loss is obtained - power loss based on existing fault current and calculation of total energy lost during temporary disturbance without autoreclose 185,714 kWh is greater than with autoreclose 258,60853982 kWh.} }