@thesis{thesis, author={Januwarsono Santoso and Pratangga Hernowo Aji}, title ={KAJIAN KELAYAKAN OPERASI DAN KELAYAKAN FINANSIAL PEMBANGKIT LISTRIK TENAGA MINIHIDRO (2 X 3,7 MW) PEBATUA 2 DI SULAWESI TENGAH}, year={2018}, url={http://156.67.221.169/507/}, abstract={To maximize the utilization of renewable energy sources and the growing demand for electricity demand in Indonesia, especially electricity demand in Central Sulawesi Province, then requires for additional units of renewable energy generation, among others, water energy, considering the potential of water energy is quite large. In this thesis will discuss the study about operation feasibility and financial feasibility of Mini Hydro Power Plant (MHPP) Pebatua 2 project. . From the results of the research, it is found that every part of the generator from the entrants to the power house must be adjusted to the topography condition in order to operate efficiently and economically. The result of voltage drop of 3.621% and network losses of 0.98%. The financial feasibility result obtained Net Present Value (NPV) 104.212.085.560 with the value of Internal Rate Return (IRR) 27,76% and Benefit Cost Ratio (BCR) 1,527, and the length of return stated Pay Back Period (PBP) for 5 years 9 months} }