@thesis{thesis, author={Paryoto Djoko and Simatupang Dony Bengkalis P}, title ={Analisis penurunan Losses untuk mengurangi Pemakaian Sendiri pada PLTA PB Soedirman}, year={2018}, url={http://156.67.221.169/513/}, abstract={Power plants using the kinetic energy of water can be generally divided into 2 parts based on the amount of generated power. They are The Hydro Electric Power Plant (PLTA) and The Micro Hydro Power Plant (PLTMH).It is said The Hydro Electric Power Plant (PLTA) where the power plant produces minimun power 10 MW and if the power generated below 10 MW then it will be included in micro hydro power (PLTMH) classification .On the The Hydro Electric Power Plant (PLTA) operations it is also needed self-use power for various things such as street lighting aids and also the existence of Losses In the annual operating plan the value of self-use will be set and be entered into one of the operational targets on The Hydro Electric Power Plant (PLTA) operations.Losses having occurred must be kept to a minimum in order not to generate a large value of self-use on hydropower operations.If Losses is not very high so that self-use will not be very high and the target operating performance set will be fulfilled.This will also increase the net power generated by a The Hydro Electric Power Plant (PLTA) so that the production value will increase and comply the electricity needs needed by consumers.. In this case I used The Hydro Electric Power Plant of PB Soedirman as a research object that I would do researching and analysing. Percentage of self-use at The Hydro Electric Power Plant of PB Soedirman the should be 2% but the fact in the field it exceeded 2%. In this study the author uses quantitative methods in managing data and uses descriptive methods to conduct problem solving analysis. Your own usage value can be saved to 0.3971%. By using the calculation formula for the payback period method, the investment costs for this research will also return within 7.57 years.} }