A PHP Error was encountered
Severity: Warning
Message: fopen(/home/rama/public_html/application/cache/sessions/rama_sessionlu7cnll5ldvq3d538i2gj5fqk7nm08cg): failed to open stream: No space left on device
Filename: drivers/Session_files_driver.php
Line Number: 174
Backtrace:
File: /home/rama/public_html/application/core/MY_Controller.php
Line: 8
Function: __construct
File: /home/rama/public_html/application/controllers/Document.php
Line: 6
Function: __construct
File: /home/rama/public_html/index.php
Line: 296
Function: require_once
@thesis{thesis,
author={WIJAYA FERDINAND EKA},
title ={ANALISIS PERHITUNGAN HARGA POKOK PRODUKSI RUMAH TINGGAL DENGAN METODE FULL COSTING DAN METODE VARIABLE COSTING PADA PERUSAHAAN JASA KONSTRUKSI (STUDY PADA CV AYORENOVASI PROYEK SUNTER 2019)},
year={2021},
url={http://repository.stei.ac.id/4721/},
abstract={Abstrak
Tujuan penelitian ini yaitu untuk mengetahui perhitungan harga pokok
produksi pembangunan rumah tinggal menggunakan metode full costing dan
variable costing dan metode yang dilakukan oleh CV Ayorenovasi.
Berdasarkan karateristik masalah yang diangkat oleh peneliti, maka
penelitian ini diklasifikasikan sebagai penelitian deskriptif kuantitatif. Data
yang digunakan dalam penelitian ini yaitu data sekunder yang diperoleh
langsung dari pihak perusahaan seperti data laporan keuangan perusahaan
terkhusus pada laporan harga pokok produksi perusahaan ssecara khusus
?Proyek Sunter tahun 2019?. Sedangkan untuk data serta data sekunder yang
lainnya diperoleh dari buku, jurnal, internet atau media lain yang mendukung
penelitian ini.
Dari hasil analisis data, hasil penelitian menunjukkan bahwa
perhitungan harga pokok produksi variable costing memiliki nilai lebih rendah
dibandingkan dengan perhitungan harga pokok produksi dengan menggunakan
metode full costing dan metode yang diterapkan perusahaan. Harga pokok
produksi yang dihitung menggunakan metode full costing yaitu sebesar Rp
2.352.464 /m2, menurut metode variable costing yaitu sebesar Rp. 2.167.326
/m2 dan menurut metode yang diterapkan perusahaan yaitu sebesar Rp.
2.207.783 /m2.
Abstract
The purpose of this study is to determine the calculation of the cost of
production of residential construction using the full costing and variable costing
methods and methods used by CV Ayorenovasi.
Based on the characteristics of the problem raised by the researcher, this
research is classified as a quantitative descriptive study. The data used in this
study are secondary data obtained directly from the company, such as the
company's financial report data, especially in the company's production cost
report specifically "Sunter Project 2019". As for data and other secondary data
obtained from books, journals, internet or other media that support this
research.
From the results of data analysis, the results show that the calculation of
the cost of goods manufactured variable costing has a lower value than the
calculation of the cost of goods manufactured using the full costing method and
the method applied by the company. The cost of production calculated using the
full costing method is Rp. 2,352,464 / m2, according to the variable costing
method, which is Rp. 2,167,326 / m2 and according to the method applied by
the company that is Rp. 2,207,783 / m2.}
}