A PHP Error was encountered

Severity: Warning

Message: fopen(/home/rama/public_html/application/cache/sessions/rama_sessionib86ls8ernurkjnn0ogm2voodl562det): failed to open stream: No space left on device

Filename: drivers/Session_files_driver.php

Line Number: 174

Backtrace:

File: /home/rama/public_html/application/core/MY_Controller.php
Line: 8
Function: __construct

File: /home/rama/public_html/application/controllers/Document.php
Line: 6
Function: __construct

File: /home/rama/public_html/index.php
Line: 296
Function: require_once

RAMA - REPOSITORY
 DETAIL DOCUMENT
ANALISA SISTEM PROTEKSI ARUS LEBIH DAN GANGGUAN TANAH PADA PENYULANG MATAHARI GARDU INDUK PONCOL BARU
Total View This Week0
Institusion
Institut Teknologi Perusahaan Listrik Negara
Author
Fauzah, Taujatul
Hariyanto, Agung
Subject
Teknik Elektro 
Datestamp
2019-12-05 12:44:36 
Abstract :
In the medium voltage distribution, there are fault that can result in a decrease in the continuity of the electric power distributed to the customer. Usually the interference that often occurs is a short circuit which can cause damage to electrical equipment as well as losses to the electrical transmission system or to consumers as users of electrical energy. Protection system is a way to prevent and limit damage to equipment due to interference, for that to localize the disturbance a protection system is needed that meets the requirements including sensitivity, selectivity, fast and reliable which can all be obtained with the accuracy of the protection equipment settings. The protective equipment used is overcurrent relay (OCR) and ground disturbance current relay (GFR) which works to instruct the power breaker to open when interference occurs. The protection equipment installed must be coordinated in advance by determining the relay operation for each fault in the relay protection area. The analysis carried out aims to calculate the magnitude of the short circuit current, determine the protection relay settings and compare them with the existing relay settings in the field. By using quantitative methods, based on the calculation results obtained the largest short circuit current value in 3 phases is 12231,991 A and the largest short circuit current in 1 phase is 955,117 A. For the TMS setting value obtained from the calculation results for 20 kV feeder side OCR is 0.183, GFR the feeder side is 0.103 and the setting for the 20 kV incoming OCR is 0.189 and the 20 kV incoming GFR is 0.241. as a whole the data from the calculation results and the data available in the field is not much different. 
Institution Info

Institut Teknologi Perusahaan Listrik Negara

A PHP Error was encountered

Severity: Warning

Message: Unknown: Failed to write session data (user). Please verify that the current setting of session.save_path is correct (/home/rama/public_html/application/cache/sessions)

Filename: Unknown

Line Number: 0

Backtrace: