Institusion
Institut Teknologi Perusahaan Listrik Negara
Author
Sinurat, Patar Mangohal Tua
Siregar, Masbah RT
Subject
Teknik Elektro
Datestamp
2019-12-05 12:49:57
Abstract :
In Indonesia, it is very potential to implement a solar power system for energy sources because it only has 2 seasons unlike in Japan, America and other countries. This planning is based on the need for electricity that must be non-stop which is distributed to the wholesale market and freezing of fish in the fishing port of Muara Angke. This is because electricity needs are very important for the process of fish distribution from the fishing port of Muara Angke. With a planned load of 104,623 kw. For such loading, 349 solar panels with a capacity of 300 Wp are arranged, arranged in 9 parallel and 13 series and directly connected to the Inverter for 3 units with a capacity of 37,500 watts. This PLTS is designed on grid to PLN, because this PLTS works when there is only solar radiation (does not use batteries). The initial investment cost of this PLTS plan is Rp1,436,972,043. The results of this planning are expected to be a reference as well as electricity practitioners in order to get a match between energy needs, price, and good quality. For this planning it is said to be feasible to be seen from the performance ratio obtained by 85%.