Institusion
Institut Teknologi Perusahaan Listrik Negara
Author
Rajagukguk, Januarisco Goyura Sakti
Hafidz, Mohammad
Subject
Teknik Elektro
Datestamp
2019-12-05 12:52:56
Abstract :
Referring to the Government Regulation on Energy and Mineral Resources (ESDM) No. 79 of 2014 concerning the National Energy Policy in 2025 the role of New Energy and Renewable Energy at least 23% (twenty three percent) and in 2050 at least 31% (thirty one percent) as long as the economy is fulfilled, so need for construction of new plants to meet these targets. Bau-Bau is one of the potential Hybrid PLTS but in its implementation there are some problems so need for studies on the addition of generation, especially in Hybrid PLTS, therefore wants to examine by simulating using ETAP 16.0.0 application. In this study gets 33424.2 kW peak load data and the total installed power plant capacity in 2021 is 52.51 MW. The results of the simulation show the stability of the Bau-Bau system network when PLTS Hybrid is declared safe from interference and still within the requirements of the applicable electric power system network rules, so that it can be connected to the Bau-Bau PLN Grid..