PENYETELAN RELAI ARUS LEBIH TRANSFORMATOR 60 MVA 150/20KV DI GARDU INDUK TANGERANG LAMA
Total View This Week0
Institusion
Institut Teknologi Perusahaan Listrik Negara
Author
Fatih, Enzo Anggitya
Hajar, Ibnu
Subject
Teknik Elektro 
Datestamp
2019-12-11 04:45:39 
Abstract :
At the substation transformer Lama Tangerang required a protection system in accordance with the requirements in order to maintain continuity of electricity power lines extended. Protection systems must meet the requirements that is safe or stable, sensitive, reliable, fast and selective so that it can work in accordance with its function as a safety in case of disruption. If the requirements are not met, it can cause damage or outages comprehensive tool that can cause decreased performance and age transformer. This final project discusses the current setting is on the side of the incoming and outgoing substation in Tangerang Lama. Relay adjustment values obtained short circuit fault current 3 phase, is 12592.148 A by setting time of 0.67 seconds and 0.29 seconds incoming side on the outgoing side. If interference occurs overcurrent protection on the outgoing side into the ultimate safety and incoming side as backup protection while outgoing side fail to work. 
Institution Info

Institut Teknologi Perusahaan Listrik Negara