Institusion
Institut Teknologi Perusahaan Listrik Negara
Author
TRIA, CHANDRIKA CAHYA RATU
Pahiyanti, Novi Gusti
Subject
Teknik Elektro
Datestamp
2019-12-19 11:53:36
Abstract :
WTC Mangga Dua is a 20 kV medium voltage customers as a central server which requires a large supply of electrical energy to meet the electricity needs to be used. To determine the suitability background network configuration on WTC Mangga Dua attached do with the ratio between the spindle network configuration and network configuration based on strong spotload of current-carrying wires used. With customers by 12:01 MVA power load calculation performed to look for where the current-carrying strong obtained yield was 434 Amperes. Limitation of the maximum load of the feeder which is equal to 300 Amperes for XLPE cable 3x240 mm2 cross-sectional area. In addition, the calculation of cost estimates for the network configuration spotload around USD 1,405,876,343.12and the estimated cost for the network configuration spindle is approximately USD 1,028,194,245.08 This value is obtained by calculation assuming the segment length at a unit price of cable used.