Penyetelan Relay Arus Lebih pada Circuit Breaker Outgoing Middle Point (CBOMP) pada Penyutang Juwita di pT.pLN (Persero) UP3 Bandengan
Total View This Week0
Institusion
Institut Teknologi Perusahaan Listrik Negara
Author
Tarigan, Ahmad Rijal
Suwarno, Suwarno
Subject
Teknik Elektro 
Datestamp
2019-12-19 11:54:01 
Abstract :
Electric power system protection or security is the protection of the generation, transmission distribution, and the distribution and utilization of the installation. Electric power protection can prevent damage to the equipment is interrupted, and equipment that are crossed by fault currents but it also can reduce or isolate the affected part of the system as small as possible and as quickly as possible to prevent the spread of disturbance. In these discussions, namely to optimize the work of the protection system installed on the feeder Juwita in substations Angke in UP3 Bandengan. To optimize the work of the protection system installed on the feeder needs to be coordination between rele installed from downstream to upstream. Rele coordination of calculation obtained the following results which Time delay (Td) is 0,4 second for Circuit Breaker Outgoing Middle Point (CBOMP) and Time delay (Td) is 0,7 second to Circuit Breaker Outgoing substations. 
Institution Info

Institut Teknologi Perusahaan Listrik Negara