ANALISA PENERAPAN MANAJEMEN BIAYA MUTU DAN WAKTU PABA PROYEK RENOVASI FACADE PONDOK INDAH MALL 1
Total View This Week0
Institusion
Institut Teknologi Perusahaan Listrik Negara
Author
Sutrisno, Bimo
Sm, Hastanto
Subject
Teknik Sipil 
Datestamp
2019-09-27 02:33:07 
Abstract :
Developments and changes in environmental conditions demanded for improvement highrise building, so we need a lot of renovations on old buildings..The method to be used in the contractor doing the renovation of the building with the operational still running, so we need a good management in order to can controlling in cost, quality and time project. The research result in the from of data about contractor detention from cost, time and quality management and the handling in the face of project management at the mall 