Institusion
Institut Teknologi Perusahaan Listrik Negara
Author
Ramadhan, Roby
Pasra, Nurmiati
Subject
Teknik Elektro
Datestamp
2019-12-19 11:55:27
Abstract :
The electric power distribution system is basically a process to deliver electricity from the electric power system of a 150 kV electricity generator of 20 kV. Of course, with the increase in customer load on each feeder can cause an increased current load. In the feeder Kurikulum and feeder Raport cards experience a voltage drop at the end of the channel, the voltage drop is 2.7% and 2.06% is above the SPLN 72: 1987 limit that is on the medium voltage network spindle configuration limit voltage drop 2% of the working voltage. The feeder that experiences a voltage drop must be carried out by breaking the load between the feeders to reduce the voltage drop in the end channel. Broken load of the kurikulum and Raport feeder by adding a new feeder called the Academy. The peak load flow of the feeder is 228 A curriculum and the reporter is rapport 220 A, with the loss of the curriculum feeder 64.85 kW and reporter reporter 31.08 kW. By carrying out a breakdown between Kurikulum feeders, Raport feeders, and new feeders (Akademi), the peak load flow of Kurikulum feeders became 185 A, penyulang Raport 135 A, and new feeders (Akademi) 155 A. With the loss of kurikulum feeders 23.24 kW, Raport 11.44 kW. And the new feeder (Akademi) is 21.39 kW.