SISTEM KERJA OVER CURRENT RELE KETIKA TERJADI GANGGUAN PADA KUBIKEL TRANSFORMER PROTECTION GARDU DISTRIBUSI B 397 GARDU INDUK MUARA KARANG
Total View This Week0
Institusion
Institut Teknologi Perusahaan Listrik Negara
Author
Sulastri, Yeyen
Siregar, M.Syukur
Subject
Teknik Elektro 
Datestamp
2020-01-16 12:03:21 
Abstract :
Continuity is one of the biggest challenges PT. PLN as the one provider of electricity in Indonesia. However, continuity is often the obstacles, one of them due to interruption protection system caused by various factors and finally impact on the distribution of electrical energy to costumers. Most of the failure of protection in the field causes of the high flow disturbance. The high flow disturbance resulted in a current transformer / CT of saturated. As happened at the B 397 distribution substation, the result of calculations showed the short circuit current its value 12419,4 A more than Over Current Rele setting of 3810 A . Given the quality of service is an important thing, then it needs to be handling as possible so that the disorder is also not to damage the system and other equipment. It must be confirmed that the attached has qualified for safe, reliable and economical so that the equipment to avoid damage as well as working well and the supply of electricity is not compromised. 
Institution Info

Institut Teknologi Perusahaan Listrik Negara