Pemasangan Trafo Sisip Guna Memperbaiki Tegangan Ujung pada Penyulang Viona di PLN (Persero) Area Teluk Naga
Total View This Week0
Institusion
Institut Teknologi Perusahaan Listrik Negara
Author
Edianto, Juriandika
Ispranyoto, Edy
Subject
Teknik Elektro 
Datestamp
2020-01-16 12:04:00 
Abstract :
Based on the measurement and percentage of the transformer loading and voltage drop at the end customer in the substation MA 4 and MA 20P viona repeater in PT.PLN (Persero) Teluk Naga Area in the measurement and percentage of service voltage loading not in accordance with the standard provisions set SPLN No. 1/1995 where the minimum voltage is +5% and -10% to the nominal voltage of service. Prior to the addition of substation substations 4 and MA 20P substation substrates experienced a load percentage of 80%. With the addition of substations, the expected percentage of overload load experienced by substations MA 4 and MA 20P can be normal again or even less than 80%. After the addition of MA 20C substation the received voltage at the tip of the finger becomes stable and the percentage of load over MA 4 and MA 20P becomes reduced. type of installation of the substation of the insert using the type of construction of outdoor partner portal. 
Institution Info

Institut Teknologi Perusahaan Listrik Negara