DETAIL DOCUMENT
PERBANDINGAN EFISIENSI TURBIN GAS PADA UNIT 1.1 SEBELUM DAN SESUDAH COMBUSTION INSPECTION DI PLTGU TAMBAK LOROK PT.INDONESIA POWER UP SEMARANG
Total View This Week0
Institusion
Institut Teknologi Perusahaan Listrik Negara
Author
WIBOWO, PRIMINTIYAN ARIF PRANATA
Rusjdi, Halim
Subject
Teknik Elektro 
Datestamp
2020-02-03 04:15:13 
Abstract :
The maintenance function is the process of maintaining a good engine in good condition. Given the performance of the turbine engine is very reliable for the electricity production process. The Steam-Gas Power Plant (PLTGU) perform maintenance based on operating hours or operating hours of components such as Gas Turbines. The purpose of the study was to determine the effect of combustion inspection on the efficiency of gas turbines by calculating the value of input and output components of the gas turbine. The Tambak Lorok Steam-Gas Power Plant performs a combustion inspection to maintain the efficiency of the unit. The ideal condition does not take into account the losses in the compressor, inside the combustion chamber or inside the turbine, to see the losses in each place must provide a picture of the actual gas turbine. 
Institution Info

Institut Teknologi Perusahaan Listrik Negara