DETAIL DOCUMENT
KONFIGURASI PEMBANGKIT LISTRIK TENAGA HIBRIDA DI ANJUNGAN LEPAS PANTAI KETAPANG
Total View This Week0
Institusion
Institut Teknologi Perusahaan Listrik Negara
Author
WERA, GEDE ARIA SUCIPTA
Hafidz, Mohammad
Subject
Teknik Elektro 
Datestamp
2020-02-11 08:17:13 
Abstract :
Based on a case study of Ketapang PCS-Java Sea offshore facility, it is observer with the wind power density in the range of 207 ~ 300Watt / m2 generate energy of 6.2MWh within a yer. Acording to Weibull distribution, & IEC 61400-1 international standard, Ketapang PCS-Java Sea included in WTG class III category (low wind). For Hybrid Configuration of the Electricity Power Supply in Ketapang PSC by conducting a simulation in the HOMER software, we found a decrease in the value of the Net Present Cost (NPC) of 39.4%; hydro carbon(CO2, NOX) emissions by 58% and the existence of excess electricity power of 2.7MWh. And by simulating the load flow with eTAP software, the voltage drop is less than the allowable threshold, which is <5% 
Institution Info

Institut Teknologi Perusahaan Listrik Negara