Institusion
Institut Teknologi Perusahaan Listrik Negara
Author
Felycia, Felycia
Sudibyo, Uno Bintang
Subject
Teknik Elektro
Datestamp
2020-02-11 08:18:13
Abstract :
The level of reliability of power plants of which supplying the district of Bogor, Cianjur, and Sukabumi is calculated into value index of LOLP (Loss Of Load Probability).The calculation period is determined from 2015 to 2020. The total installed power capacity of 330 MW were supplied by Geothermal Salak for six units which is analyzed the value of PLN LOLP to fullfill the standards that a maximum of 3 days / year. But in 2018 LOLP value of 12.055 days per year. Therefore the researcher suggests to build PLT wind potential of 10 MW in Sukabumi so the value of 3.003 LOLP turning into day per year. Similarly, in 2019 and 2020 LOLP value of 41.6675 days per year and 48.754 days per year. PLN Patuha planned to develop geothermal power plants in 2019 amounted to 2 x 55 MW so that the level of reliability in 2019 until 2020 is able to meet the international standard of the value LOLP maximum of 0.25 day per year.