A PHP Error was encountered

Severity: Warning

Message: fopen(/home/rama/public_html/application/cache/sessions/rama_sessionlgbjeg07h4796sk9t7c4mps1juni74tp): failed to open stream: No space left on device

Filename: drivers/Session_files_driver.php

Line Number: 174

Backtrace:

File: /home/rama/public_html/application/core/MY_Controller.php
Line: 8
Function: __construct

File: /home/rama/public_html/application/controllers/Document.php
Line: 6
Function: __construct

File: /home/rama/public_html/index.php
Line: 296
Function: require_once

RAMA - REPOSITORY
 DETAIL DOCUMENT
UPAYA MENGATASI JATUH TEGANGAN DAN RUGI DAYA PADA JARINGAN TEGANGAN RENDAH DENGAN PEMBANGUNAN GARDU SISIP TIPE PORTAL
Total View This Week0
Institusion
Institut Teknologi Perusahaan Listrik Negara
Author
Auliya, Siti
Handayani, Oktaria
Subject
Teknik Elektro 
Datestamp
2020-02-11 08:46:39 
Abstract :
In the system of reliability of electric power distribution that is concerned is good and stable voltage quality, because although the continuity of the supply of electrical energy is reliable, but still there will be a voltage drop. Another factor that affects the system voltage change is the power loss caused by the impedance of the conductor channel series, this power loss causes a voltage drop. Consumers who are located far from the service point tend to receive relatively lower stresses, when compared to the voltage received by consumers who are located close to the service center. The existence of a voltage drop on the receiving end pole can cause the network current to be high so that losses that occur in the network increases. To overcome these problems then performed network repair by building substation distribution insertion so as to improve the quality of the voltage and minimize the loss of power on the network. From the calculation of the percentage value of the voltage drop in PT. PLN Area Cikupa before the installation of the substation is 10.6% for the S phase 1 and 11.7% for the S phase 4, the value is not in accordance with SPLN No. 1 of 1995, the tolerance limit of service voltage variation as a result of voltage loss is a maximum of + 5% and a minimum of -10% at the service side. After the installation of the substation was installed, the voltage dropped to 5.1% for the S phase 1 and 6.1% for the S phase 4, where the value was in accordance with the standard 
Institution Info

Institut Teknologi Perusahaan Listrik Negara

A PHP Error was encountered

Severity: Warning

Message: Unknown: Failed to write session data (user). Please verify that the current setting of session.save_path is correct (/home/rama/public_html/application/cache/sessions)

Filename: Unknown

Line Number: 0

Backtrace: