DETAIL DOCUMENT
ANALISIS UNJUK KERJA BOILER FEED PUMP PLTU MUARA KARANG UNIT 5
Total View This Week0
Institusion
Institut Teknologi Perusahaan Listrik Negara
Author
Anshori, Thantowi
Prabowo, Eri
Nurhasanah, Roswati
Subject
Teknik Mesin 
Datestamp
2019-10-07 04:26:32 
Abstract :
Boiler Feed Pump in Unit 5 PLTU Muara Karang has important role to circulate Demin water from Deaerator to Steam Drum Boiler. Unit 5 PLTU Muara Karang has been Operated for almost 40 years. Boiler Feed Pump has been indicated having decline of performance. Therefore, Boiler Feed Pump Performance should be evaluated. Evaluation menthods those are operated are operations Data collection and direct calculation of Boiler Feed Pump Efficiency and calculation of electrical Motor Power supply (Boiler Feed Pump driver) Will be compared. So that, the value of decline of Boiler Feed Pump Performance Will be known. 

File :
Thantowi.pdf
Institution Info

Institut Teknologi Perusahaan Listrik Negara