Abstract :
Electrical energy plays a very important role in supporting human life.
However, the existence of fossil fuels used in most power plants is getting
depleted and results in carbon dioxide emissions. This is a major factor in the
development of new and renewable energy. Solar cells are a new and
renewable energy that has great potential for use in Indonesia.
Residential-scale PLTS planning uses a Solar Power Plant (PLTS) as a
source of electrical energy. This final project uses data on residential buildings
as a load to determine the capacity of the PLTS system.
The results of the PLTS solar power plant planning show that the total
power at the house is 1473 watts where the total energy obtained is 19118 wh. While the total number of main components of PLTS is 16 solar panels, 2 Solar Charge controllers (SCC), 1 inverter, 2 batteries and the total details of the budget required in the planning process for a solar power plant of Rp. 77,982,000.