Abstract :
The amount of electricity needs in Negri pushed us as a potential successor to the nation in order to address the needs in their own country, especially regarding the need for electrical energy in Indonesia. Electrical energy needs to be an absolute existence, as many sustain economically nor education.
In order to utilize renewable energy resources we have to do is overcome berbagaimana utilize the energy resources of nature in the area that have the potential for the construction of renewable energy (renewable energy) Micro-Hydro Power Station (PLTMH) in order to replace fossil energy, such as those used in other types of plants, such as power plant, power plant and diesel will run out soon and needs time to re availability.
Design of Micro-Hydro Power Plant with a capacity of 60 kW. Use of Micro-Hydro Power Station (PLTMH) is expected to meet the needs of poor villages, especially in the village Cibunian Pamijahan District of Bogor Regency, West Java who have not received electricity network from the government in order to meet the needs in terms of education and economic related.