Institusion
Institut Teknologi Perusahaan Listrik Negara
Author
R. Hala, Patrisius
Husada, Hendrianto
Suyanto, Heri
Subject
Teknik Elektro
Datestamp
2022-10-14 02:24:57
Abstract :
The need for electrical energy continues to increase and its provision is increasingly limited because electrical energy production in Indonesia?s still depends on conventional energy. This has an impact on the increase in the basic electricity cost from PLN. Solar Power Generation An alternative energy that can be used by taking advantage of photovoltaic modules to convert solar energy into electrical energy. Therefore, in this study a solar power plant plan for households that takes care of electricity and electricity from PLN will be made. So what needs to be considered is how the On-Grid installer system is connected to the PLN network, by calculating the load requirements that will be supplied in this PLTS planning, which is 4418 Wh. The amount of power generated is 3615 kWh in one day and 1319,475 kWh per year. From this plan, it is obtained a performance ratio of 90,37% so that it can be said that this system is feasible to be realized. The initial investment for this PLTS requires a fund of 22.600.000.