Frequency is a quality standard on the power system network that must be maintained in its normal operation. Frequency stability refers to the balance between the power supply and the load generation. In the event of major disturbances, many units come out of operation so that the system?s generation capability is much lower than the load needs, which may cause the system to blackout. If this happens then the power system should immediately restore its generation ability to be able to immediately serve the burden or power users. In this thesis, get a large burden that must be sent by PLTA Saguling to PLTU Suralaya for start up process is carried out on the 500 kV network by restoring GITET on the Western system with the attention of frequency to return to normal frequency assisted by using the DIgSILENT software 15.1.7. From the simulation done, GITET Suralaya recovered at the frequency of 50.072 Hz, GITET Cilegon Baru at 49.825 Hz, GITET Cibinong at 49.825 Hz, GITET Bekasi at 49.953 Hz, GITET Cawang at 50.064 Hz, GITET Kembangan at 50.078, and GITET Gandul at 49.866 Hz 
Institution Info

Institut Teknologi Perusahaan Listrik Negara