Analisis Koordinasi Rele Arus Lebih dan Rele Gangguan Fasa ke Tanah pada Sistem Proteksi PLTA Jelok
Total View This Week0
Institusion
Institut Teknologi Perusahaan Listrik Negara
Author
Rosalina, Christiana Deasy
Simamora, Yoakim
Azis, Hastuti
Subject
Teknik Elektro 
Datestamp
2022-10-12 02:45:32 
Abstract :
Renewal setting of over current relay and ground fault relay in the PLTA Jelok?s protection system is important because there is no change in the setting value since PLTA Jelok stood in the 1935. Fast, reliable, selective and economical protection system needs to be improved according to the latest load values and short circuit that may occur. For setting these relays, the required selection of the pickup current value and the working time based on the calculation limit of the full load current, maximum short circuit current and minimum short circuit current. Then the coordination of relays can be analyzed using the time-current plot curve on ETAP 12.6 program. Relays setting of this research are reliable because the curve location is on the right of full load ampere line and transformer inrush and also on the left of damage curve. 
Institution Info

Institut Teknologi Perusahaan Listrik Negara