DETAIL DOCUMENT
EVALUASI KINERJA SISTEM PEMBANGKIT LISTRIK TENAGA SURYA ON GRID ATAP PT. INDESSO AROMA CILEUNGSI
Total View This Week0
Institusion
Institut Teknologi Perusahaan Listrik Negara
Author
Erdami, Meissy
Pawenary, Pawenary
Subject
Teknik Elektro 
Datestamp
2022-10-12 03:05:20 
Abstract :
The continuous use of fossil fuels can cause environmental pollution. To reduce dependence on fossil fuels, an alternative source of electricity is needed, namely from solar energy that is environmentally friendly. The solar power generation system is a system that comes from solar energy which is converted into electrical energy. PT. Indesso Aroma installed solar panels because they play an active role in government regulations regarding the use of renewable energy using an on-grid system or connected to a power source from PLN. In this study using descriptive quantitative methods which describe an event or phenomenon that is happening today by determining the problem of the objectives and benefits of the research and collecting the data needed in making the report. The interconnection system for PLTS at PT. Indesso Aroma Cileungsi with PLN, where the 20 kV PLN voltage supplies PT. Indesso Aroma Cileungsi with the power of each transformer 1250 kVA, while the PLTS supplies 6250 kVA for each solar panel with a capacity of 300 Wp with an inverter with a capacity of 250 kW connected to the transformer. . The power of each transformer is 300 kVA which enters the consumer load. The initial investment cost is Rp. 8,761,600,000 with savings of Rp. 1,320,552,000 / year. The ROI percentage value obtained from the ROI calculation is 14%. 
Institution Info

Institut Teknologi Perusahaan Listrik Negara