A PHP Error was encountered

Severity: Warning

Message: fopen(/home/rama/public_html/application/cache/sessions/rama_session0epr80d37e88jf7a01tsdvffpff0kb0i): failed to open stream: No space left on device

Filename: drivers/Session_files_driver.php

Line Number: 174

Backtrace:

File: /home/rama/public_html/application/core/MY_Controller.php
Line: 8
Function: __construct

File: /home/rama/public_html/application/controllers/Document.php
Line: 6
Function: __construct

File: /home/rama/public_html/index.php
Line: 296
Function: require_once

RAMA - REPOSITORY
 DETAIL DOCUMENT
KAJIAN DISTRIBUSI PERENCANAAN PEMBANGKIT LISTRIK TENAGA MINIHIDRO PEBATUA 2 (2 X 3,7 MW) DI DONGGALA SULAWESI TENGAH
Total View This Week0
Institusion
Institut Teknologi Perusahaan Listrik Negara
Author
Kholiliyah, Emy
Januwarsono, Santoso
Pratama Putera, Rizki
Subject
Teknik Elektro 
Datestamp
2022-10-11 07:57:30 
Abstract :
Indonesia's geographical condition in large archipelago can be utilized source of water sourced energy into Hydro Power, based on its classifications PLTA can be used as Minihidro power plant with capacity 1-10 MW. In Donggala regency, Central Sulawesi, there is a potential that can be used as a PLTM with a capacity of 7.4 MW, the conditions in the area are still not yet electrified evenly. The development of PLTM generates electricity that is distributed to consumers with a fairly reliable and secure. Therefore, this research discusses the feasibility study of the operations and financial aspects of the distribution of electrical power. The method used is quantitative descriptive by analyzing the voltage and network shrinkage data by using the ETAP software 12.6.0 as well as analysing the financial cost of the investment to the cost of expenditure. On the planning of development of the PLTM distribution system Pebatua 2 in relation to the plant to the point of transaction to the GD Pasang Kayu?s system with a distance of ± 4 km, has a drop voltage value of 2.1% and a losses value of 2.22%. The development of the PLTM distribution system based on standard criteria can be said to be feasible from the operation side. Development of PLTM is said to be feasible from the side of the operation based on investment costs Rp. 1.54 billion has NPV = Rp 445,561,980, IRR = 16.36%, BCR = 1.29 and PBP = 6 years, shows to refund capital costs in 6th. 
Institution Info

Institut Teknologi Perusahaan Listrik Negara

A PHP Error was encountered

Severity: Warning

Message: Unknown: Failed to write session data (user). Please verify that the current setting of session.save_path is correct (/home/rama/public_html/application/cache/sessions)

Filename: Unknown

Line Number: 0

Backtrace: