DETAIL DOCUMENT
ANALISIS PRODUKTIVITAS PEKERJA PADA PEKERJAAN PEMBESIAN PILE HEAD DENGAN METODE WORK SAMPLING DI PROYEK LANJUTAN PEKERJAAN AKSESIBILITAS BANDAR UDARA INTERNASIONAL SOEKARNO-HATTA, TANGERANG, BANTEN
Total View This Week0
Institusion
Institut Teknologi Perusahaan Listrik Negara
Author
FEBISTIADANA, NADIAKA
Kustanrika, Irma Wirantina
Subject
Teknik Sipil 
Datestamp
2022-10-06 02:16:03 
Abstract :
Labor productivity is one of the main elements in determining the successful implementation of a construction project, but often the use of labor is not effective. Work sampling is one approach that can be used to measure productivity quite easily. The purpose of this study is to analyze the productivity of workers in pile head clearing work in the Continuation Project of the Soekarno-Hatta Airport, Tangerang, and Banten accessibility work with the work sampling method. The size of the productivity of the workforce can be seen from the effective activity data. The productivity measure obtained from this analysis is the Labor Utilization Rate (LUR). The results of the work sampling analysis showed that the overall LUR observation and analysis of the Soekarno-Hatta airport accessibility project was 43.65% with the proportion for effective activities 35.9%, essential contributory 31% and ineffective 33.1%. 
Institution Info

Institut Teknologi Perusahaan Listrik Negara