A PHP Error was encountered

Severity: Warning

Message: fopen(/home/rama/public_html/application/cache/sessions/rama_sessionuf8hqsn2178srhgv32mu6l4uv9jq8og3): failed to open stream: No space left on device

Filename: drivers/Session_files_driver.php

Line Number: 174

Backtrace:

File: /home/rama/public_html/application/core/MY_Controller.php
Line: 8
Function: __construct

File: /home/rama/public_html/application/controllers/Document.php
Line: 6
Function: __construct

File: /home/rama/public_html/index.php
Line: 296
Function: require_once

RAMA - REPOSITORY
 DETAIL DOCUMENT
Analisis Penurunan (Settlement) Timbunan Diatas Tanah Lempung Lunak Dengan Menggunakan Aplikasi Komputer (Studi Kasus Proyek Jalan Tol Serpong – Balaraja Seksi 1A)
Total View This Week0
Institusion
Institut Teknologi Perusahaan Listrik Negara
Author
Rahayu, Indah Suci
Kusumastuti, Dyah Pratiwi
Subject
Teknik Sipil 
Datestamp
2022-10-05 08:01:09 
Abstract :
Soft clay soils often cause problems in the structure above which are caused by problems with weak bearing capacity, which can result in planning for the embankment to have a large amount of compression, therefore it is necessary to plan subgrade improvement piles to increase bearing capacity and accelerate the process of soil compression. So that the preloading method is needed to speed up the consolidation process and the calculation of the consolidation compression is 0.67 m. For the comparison of the time of reduction of PVD or without PVD using manual methods from the analysis of calculations that have been carried out, it is found that the planned embankment height (HR) is 6 m, so the length of time for subsidence without PVD (prefabricated vertical drain) is 42.23 years, and for time Soil subsidence using PVD for a triangular installation pattern is 26 weeks, while in the rectangular installation pattern it is 31 weeks. From the GeoSlope / w software results, it is found that the pile at a height of 5 m has a safety factor of 0.826, while the results of the Sigma / w software using a triangular mounting pattern pvd have a decrease of 0.018 m. 
Institution Info

Institut Teknologi Perusahaan Listrik Negara

A PHP Error was encountered

Severity: Warning

Message: Unknown: Failed to write session data (user). Please verify that the current setting of session.save_path is correct (/home/rama/public_html/application/cache/sessions)

Filename: Unknown

Line Number: 0

Backtrace: